MPPT Charge Controller User Manual - Feb. 2019 15
5.4 CABLES AND FUSES
The required cross section of the wires depends on their length and the rated voltage of your system.
Select the location of the mast and measure the distance from the mast top to the battery. Select the
minimum cross section required in the basis of the following tables. The three AC cables need to have
the same cross section.
System voltage 12 Volt
Distance from wind generator to the charge controller (m)
Cable cross section mm
2
- AWG
Distance from the charge controller to the battery (m)
Cable cross section mm
2
- AWG
Distance from wind generator to the charge controller (m)
Cable cross section mm
2
- AWG
Distance from the charge controller to the battery (m)
Cable cross section mm
2
- AWG
Distance from wind generator to the charge controller (m)
Cable cross section mm
2
- AWG
Distance from the charge controller to the battery (m)
Cable cross section mm
2
- AWG
For protection against high voltage spikes and/or an accidental short-circuit event, fuses must be
installed in the positive (red) wires to the battery. The required value of the fuse depends on the rated
current of the Silentwind generator and solar panels connected to the Hybrid Boost Charge Controller.
We recommend:
Max Current (A)
(Silentwind generator + Solar Panel)