MPPT Charge Controller User Manual - Feb. 2019 27
7. RESET
Reset the Hybrid Boost Charge Controller: Please press the reset button for 10s.
Total reset of The Hybrid Boost Charge Controller:
Follow the correct assembly/disassembly order.
o How to disconnect the charge controller (wind, solar, battery):
1
st
Disconnect the Silentwind generator (to avoid risks, once you remove the 3 wires from the
generator, please put at least 2 wires from the generator together to cause a short circuit and slow
down the rotation of the blades).
2
nd
Disconnect the solar panels if available.
3
rd
Disconnect Battery.
Following this order sequence is very important, otherwise the Hybrid Boost Charge Controller
will be damaged.
o Leave the Hybrid Boost Charge Controller for at least 10 min. to rest to dissipate all
energy.
o After 10 minutes connect the cables on the inverse order:
1
st
Connect the Hybrid Boost Charge Controller to the battery;
2
nd
Connect solar panels;
3
rd
Connect the Silentwind generator and insert the parameters again.