1 USERSINSTRUCTIONS................................................................................................................................... pag. 4
2 USERSPRE-SERVICECHECKLIST................................................................................................................ pag. 7
3 BOILERREGISTRATION.................................................................................................................................. pag. 8
4 COMMISSIONINGBOILERCHECKLIST.......................................................................................................... pag. 9
5 SERVICERECORDS......................................................................................................................................... pag.10
6 INSTALLERSINSTUCTIONS........................................................................................................................... pag.13
FONDERIE SIME S.p.A.ofViaGarbo27-Legnago(VR)-Italydeclaresthatitshotwaterboilers,whichbeartheCEmarkunder
GasDirective90/396/CEEandarefittedwithasafetythermostatcalibratedtoamaximumof110°C,are not subject toapplication
ofPEDDirective97/23/CEEastheymeettherequirementsofarticle1paragraph3.6oftheDirective.
Alldescriptionsandillustrationsprovidedinthismanualhavebeencarefullypreparedbutwereservetherighttomakechange
andimprovementsinourproductsthatmayaffecttheaccuracyoftheinformationcontainedinthismanual.
SIME CENTRAL HEATING BOILERS - WARRANTY
ThisWarrantyisgrantedtoyoubyHuntHeatingABN50
354796935,inrespectofyouracquisitionofaSimeCen-
tralHeatingBoilerwithintheCommonwealthofAustralia.
ThisWarrantydoesnotinanywayaffectyourrightsunder
anyTradePracticesAct,andisinadditiontoyourimplied
legalrights.
Providedthattheinstallationoftheboilerisinaccordan-
cewiththespecicationsprovidedtoyouoryourlicensed
installer,theboileriswarrantedbyHuntHeatingagainst
defects caused by the manufacturer’s faulty materials
and/orworkmanship,inrespecttoparts and labour,for
aperiodoftwelvemonthscommencingfromthedateof
commissioningoftheboiler.oramaximumof18months
fromthedateofdeliveryfromHuntHeatingwhicheveris
theearlier.
TheLicensedInstallermustcompletetheinformationat
theinsection3.0ofthismanual.Failuretodosomaycau-
setheWarrantytobecomenullandvoid.
IMPORTANT
When carrying out the commissioning of the boilers, it is highly recommended that you perform the following checks:
– Make sure that there are no flammable liquids and or materials in the immediate vicinity of the boiler.
– Make sure that the electrical connections have been made correctly and that the earth wire is connected to a good earthing
system.
– Open the gas tap and check the soundness of the connections, including that of the burner.
– Make sure that the boiler is set for operation for the type of gas supplied.
– Check that the flue for the outlet of the products of the combustion is unobstructed.
– Make sure that any shutoff valves are open.
– Make sure that the system is charged with water and is thoroughly vented.
INSTALLATION AND ALL SERVICING MUST BE
CARRIED OUT BY AN AUTHORISED PERSON
CONTENTS
USERSINSTALLER