Do you have a question about the Sime MURELLE EV and is the answer not in the manual?
Fuel Type | Natural Gas / LPG |
---|---|
Heat Exchanger Material | Stainless Steel |
Installation | Wall-mounted |
Flue Options | Horizontal or Vertical |
Dimensions | 700mm x 400mm x 290mm (typical, may vary slightly by model) |
Key checks recommended before commissioning the boiler for safe and proper operation.
General guidelines and requirements for boiler installation, including room type and environmental conditions.
Explanation of the boiler's anti-freeze protection, its activation conditions, and limitations.
Instructions for cleaning the heating system before installation to prevent corrosion and deposits.
Procedure for filling the boiler and heating system with water.
Requirements for chimneys and flues for combustion product evacuation, respecting laws.
Guidelines for installing separate ducts, including insulation and condensation considerations.
Requirements for installing forced exhaust systems, including insulation and condensation.
Instructions for replacing power cables, grounding, and safety precautions during electrical work.
Detailed electrical diagram for Murelle EV 25-30 OF models, showing connections and components.
Procedure to access installer parameters, scroll through them, and change default settings.
Description of gas valves used and their pressure settings (max/min) for different gases.
Step-by-step guide for gas conversion and required parameter settings.
Details on fumes, low/high water pressure anomalies and their causes/solutions.
Details on D.H.W. and heating sensor anomalies, their causes and impact on boiler function.
Details on flame block (ALL 06) and safety thermostat (ALL 07) anomalies and their causes.
Details on water circulation (ALL 09), auxiliary sensor (ALL 10), modulator (ALL 11), and configuration (ALL 12) anomalies.
Procedure for initial ignition, subsequent start-ups, and selecting winter/summer operating modes.