SDB670 AC POWER CORD 21
ELECTRICAL CONNECTIONS 22
GENERAL 22
REAR PANEL CONNECTORS 22
Tx/Rx CONNECTIONS 23
Power Connection 23
Earth Point 24
P5 Ethernet 24
S1 Facilities Connector 25
S2 Serial Port 26
P3 USB A Duel 26
P4 USB B 26
Battery Back-up 26
WALL MOUNT INSTALLATION 28
TOOLS, TEST EQUIPMENT AND MATERIALS REQUIRED 28
INSTALLATION OF THE WALL MOUNT UNIT 28
FITTING THE SDB670 BASE STATION 29
ELECTRICAL CONNECTIONS 30
RACK MOUNT INSTALLATION PROCEDURE 32
RACK PREPARATION 32
FITTING THE SDB670 BASE STATION 33
ELECTRICAL CONNECTIONS 35
CONFIGURATION OF NEW TIER II BASE STATION 36
TOOLS, TEST EQUIPMENT AND MATERIALS REQUIRED 36
SDB670 PREPARATION 36
SDMT INSTALLATION AND PREPARATION 37
INSTALLING THE IP CONFIGURATION SERVER 37
IP ADDRESS CONFIGURATION 37
CONFIGURING THE DMR BASE 38
CONFIGURATION OF NEW TIER III BASE STATION 41
TOOLS, TEST EQUIPMENT AND MATERIALS REQUIRED 41
SDB670 PREPARATION 41
SDMT INSTALLATION AND PREPARATION 42
INSTALLING THE IP CONFIGURATION SERVER 42
IP ADDRESS CONFIGURATION 42
CONFIGURING THE DMR BASE 43
Platform and Application Software Update 43
CONFIGURATION CREATION & UPLOAD 45
Enable Bases 46
BASE CONFIGURATION TIER II TO TIER III 48
TOOLS, TEST EQUIPMENT AND MATERIALS REQUIRED 48
TIER II BASE PREREQUISITES 48
IP ADDRESS CONFIGURATION 48
CONFIGURING THE DMR BASE 49
ABBREVIATIONS 53
Doc Number: TNM-I-E-0041 Revision 1.6 Page 7