EasyManuals Logo

Simrad CX34-DE NavStation User Manual

Simrad CX34-DE NavStation
62 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #54 background imageLoading...
Page #54 background image
Chassis
Radome (bottom)
Mount base
To ships hull
Grounding wire
Crimp terminal
Terminal
(accessory)
Ground wire
Installation 1-48 CX34/44/54-series
1.13.5 Grounding wire
Connect a grounding wire from one of the bolts on the scanner base, as shown
below. The crimp terminal and grounding wire are installer-supplied.
Radome
Open scanner
1.13.6 Initial start-up of radar function
Initial start-up after installation or after long storage (6 months), the scan-
ner will need an extra 20 minutes to warm up, so after Power on and going
into Standby, the radar function must be left in Standby mode for an extra 20
minutes to properly warm up the scanner. This way you will contribute to the
lifetime of the magnetron in the radar scanner.
Note: Normal start-up at regular usage will take approx. two minutes for the
scanner to warm up and be ready for transmission. For further instructions,
refer to the user manual.

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Simrad CX34-DE NavStation and is the answer not in the manual?

Simrad CX34-DE NavStation Specifications

General IconGeneral
BrandSimrad
ModelCX34-DE NavStation
CategoryMarine GPS System
LanguageEnglish

Related product manuals