GASKET
PLUNGER
LOW
MARK
HIGH
MARK
OIL
RESERVOIR
Fig.
2. Machine
Base
and Oil Reservoir
See that plunger is in place, as
shown
in Fig. 2, Use shims on corners,
when
required to insure that
before placing
machine
on base. base is level, so that oil level will be accurately in
dicated
by marks on
base.
Machine
base
and
oil
reservoir
fits
into
standard
table
cut-out and
rests
on four corners without bolting. Machine head is not
fastened
but should
rest
on cork
Rasp edges of cut-out, shown in Fig. 2, if necessary, gasket in base.
Machine
hinge pins must not support
so
that
machine
does
not touch
table
when
placed
on the head
except
when machine is
tilted
back,
base.
THEKNEE
LIFTER
Knee lifter is shipped assembled to the base ex
cept for the knee plate and lifter lever.
Loosen the two clamp screws shown in Fig. 3 and
slide
the rock shaft forward to position shown.
Attach,
lifter
lever.
Set the stop screw, Fig. 3, so that there is only a
little play in the lever before it starts to lift the
presser
bar. Then
tighten
lock
nut
on
stop
screw.
Set the rear stop dog to allow the presser bar to be
raised
to
its
limit and
tighten
the
two clamp
screws.
CAUTION: Do not
operate
machine until it
has
been
thoroughly lubricated in
accordance
with the following
instructions.
STOP
SCREW
LOCK
NUT
ROCK
SHAFT
CLAMP
SCREWS
LIFTER
LEVER
REAR
STOP
DOG
KNEE
PLATE
I