EasyManua.ls Logo

Sinoboom GTJZ0612E - Conducting a Pre-Operation; Inspection; Inspecting Parts; Inspecting Entire Machine

Sinoboom GTJZ0612E
114 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
© Mar. 2022 5-2 GTJZ0612E&0812E&1012E&1212E Operation Manual
PRE-OPERATION INSPECTION
TIPPING HAZARD
Do not change or modify the aerial
work platform without the prior writ-
ten permission of the manufacturer. If
an additional device is installed on
the platform or guardrail for placing
tools or other materials, this will in-
crease the platform weight and sur-
face area or increase the load.
CONDUCTING A PRE-
OPERATION INSPECTION
Before starting the machine, check whether it meets the
following requirements:
Ensure the Operation Manual and Maintenance
Manual are in good condition, legible and stored in
the storage compartment on the platform.
Make sure all labels are legible and appropriately
located.
Check for hydraulic oil leaks. Check for proper oil
level. See Inspect Hydraulic Oil Level, page 5-3.
Add oil as needed.
Check whether the battery level is less than 70%.
See Inspect Battery Level, page 5-3. Charge the
battery as needed.
Check whether the protective device in use matches
the type of work performed and conforms to relevant
technical standards.
INSPECTING PARTS
Before each use or work shift, check the machine for
any damaged, improperly installed, loose or missing
parts and unauthorized changes:
Electrical components, wiring, cables and safety
ropes
Hydraulic power unit, oil tank, fittings, hoses,
cylinders and manifolds
Battery pack and wiring
Drive motors
Tires and wheels
Safety arm
Limit switches and horn
Alarms and LEDs
Nuts, bolts and other fasteners
Platform (including rails, floor plate, safety lock,
brackets and entry door)
Figure 5-1
Pothole guard
Scissor arm pins and fasteners
Control handles
Personal protection equipment
Emergency control equipment
Operation instructions, warning and control decals
NOTICE
If any part is found damaged, missing, or improperly
installed, please immediately replace it with a new
one and install it correctly; if any fastener is found
detached or loose, please tighten it immediately.
INSPECTING ENTIRE
MACHINE
Inspect the entire machine for damage:
Cracks in a weld joint or structural par
Dents or other damage
Severe rust, corrosion or oxidation
Improper twisting of steel wire ropes, electric cables,
hoses inside the platform
Missing or loose structural parts and key compo-
nents, including fasteners and pins for correct posi-
tioning and tightness
The folding platform’s ability to support the platform
side rail and proper installation of safety pin with
wire rope

Table of Contents

Other manuals for Sinoboom GTJZ0612E

Related product manuals