EasyManua.ls Logo

Sinoboom GTJZ0612E - Operation from Ground; Operation from Platform; SINOBOOM System

Sinoboom GTJZ0612E
114 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OPERATING THE MACHINE
GTJZ0612E&0812E&1012E&1212E Operation Manual 7-3 © Mar. 2022
3. Pull out the emergency stop button on the platform
controller to ON position.
4. Pull out the emergency stop button on the ground
controller to the ON position, and meanwhile press
the Enter key, the adjustment screen will show on
the display..
5. Press the Page Down key until the display shows
“System Setting”, then press the Enter key.
6. Press the Page Down key until the display shows
“Brake Release”, then hold the Enter key for 5s.
7. When the message “Brake Is Released” shows on
the display, the brake is released successfully.
8. The machine can be moved by human power.
9. After the towing is completed, re-energize the ma-
chine, and the brake can operate properly.
10. Remove the chokes as needed.
NOTICE
The allowable towing speed is 3km/h (1.9mph).
OPERATION FROM
GROUND
UNSAFE OPERATION HAZARD
Unless in emergency situations,
do not operate from the ground
controller when there are
personnel in the platform.
Do not operate the machine if any
control handle or switch is not
returned to off position after being
released.
Before operating the machine:
1. Turn the key switch on the ground controller to the
ground control position.
2. Pull out the emergency stop button on the ground
controller to the ON position.
3. Ensure the battery is properly connected.
Platform up/down
Simultaneously hold the enable switch and the platform
up/down switch to raise/lower the platform.
To drive
The drive function cannot be operated from the ground
controller.
To steer
The steer function cannot be operated from the ground
controller.
OPERATION FROM
PLATFORM
UNSAFE OPERATION HAZARD
Unless in emergency situations,
do not operate from the ground
controller when there are
personnel in the platform.
Do not operate the machine if any
control handle or switch is not
returnted to off position after
being released.
SINOBOOM SYSTEM
Before operation
1. Turn the Ground/Platform select switch on the
ground controller to Platform.
2. Pull out the red emergency stop buttons on both the
ground and platform controllers to the ON position.
3. Ensure the battery is well connected.
To position platform
Move upwards the lift function enable switch and hold
the enable switch on the joystick and push forward/
backward the joystick to raise/lower the platform.
To drive
1. Move downwards the drive/steer enable switch and
hold the enable switch on the joystick and push
forward/backward the joystick to drive the machine
forward/backward.
2. Speed up: slowly move the joystick off center.
3. Speed downslowly move the joystick toward
center.
4. Stopreturn the joystick to center or release the
enable switch.
When the boom is in operating position, the drive speed
of the machine will be restricted.
The battery condition will affect the machine
performance. When the platform display indiciates a
low battery level, the drive speed and lift speed of the
machine will go down.

Table of Contents

Other manuals for Sinoboom GTJZ0612E

Related product manuals