EasyManua.ls Logo

Skyjack SJ 4632 - Page 20

Skyjack SJ 4632
130 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SKYJACK, Page 21SJIII Series
Section 1 - Scheduled Maintenance Service and Maintenance
Steer Cylinder Assembly•
Ensure steer cylinder assembly is -
properly secured and there are no loose
or missing parts.
Wheel/Tire Assembly•
The aerial platform is either equipped with
solid rubber tires or foam-filled tires. Tire
and/or wheel failure could result in an aerial
platform tip-over. Component damage may
also result if problems are not discovered and
repaired in a timely fashion.
Check all tire treads and sidewalls for -
cuts, cracks, punctures and unusual
wear.
Check each wheel for damage and -
cracked welds.
Check each lug nut for proper torque to -
ensure none are loose.
Check wheel motor assembly for loose -
or missing parts and signs of visible
damage.
Ensure wheels are aligned and true -
vertically and horizontally.
Tie Rod (Conventionals)•
Ensure there are no loose or missing -
parts, tie rod end studs are locked and
there is no visible damage.
Greasing Points•
Ensure greasing points have no sign of -
visible damage and are free from dirt and
obstructions.
B - Frequent Inspection
Locate grease fittings and pump grease -
as needed.
Steer Cylinder
Tie RodWheel Motor
Greasing Point
Conventional
Wheel/Tire
Wheel/Tire

Table of Contents

Other manuals for Skyjack SJ 4632

Related product manuals