EasyManuals Logo

Skyjack SJ30 AJE User Manual

Skyjack SJ30 AJE
103 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #40 background imageLoading...
Page #40 background image
43
SJ30 AJE SJ30 ARJE 213213AAA
Visual & Daily Maintenance Inspections Section 4 – Pre-operation
4.2-8 Platform assembly
Ensure there are no loose or missing parts and
there is no visible damage.
Ensure all fasteners are securely in place.
Ensure fall protection anchorage(s)
1
are
secure and there is no visible damage.
Ensure all railings
2
are properly positioned
and secured.
Ensure gate (if equipped)/drop bar
3
is in
good working order.
Ensure footswitch
4
is in good working
order and has not been modied, disabled or
blocked.
Ensure MEWP oor
5
is secure and there is
no visible damage.
Ensure AC outlet has no visible damage and is
free from dirt or obstructions.
5
Platform control console
Ensure all switches/controllers are returned to
neutral.
Ensure there are no loose or missing parts and
there is no visible damage.
6
Manuals
Ensure a copy of operating manual, and other
important documents are enclosed in manual
storage box.
1. Check to be sure manual storage box is
present and in good condition.
2. Ensure manuals are legible and in good
condition.
3. Always return manuals to the manual storage
box after use.
3
1
1
2
4
5
6
5
To order go to Discount-Equipment.com

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Skyjack SJ30 AJE and is the answer not in the manual?

Skyjack SJ30 AJE Specifications

General IconGeneral
BrandSkyjack
ModelSJ30 AJE
CategoryBoom Lifts
LanguageEnglish

Related product manuals