EasyManua.ls Logo

Skyjack SJ30AJE - Page 138

Skyjack SJ30AJE
190 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
138
SJ30AJE, SJ30ARJE196274AF
Section 5 – Procedures Platform
Pin 27 - Riser function selected. Input from wire 30A.
Neutral position= 3.58 volts.
Riser down function= 2.41 volts.
Riser up function= 4.83 volts.
Test between pin 27 and 02 wire.
Pin 28 - Turret rotate input. Wire X from boom joystick controller.
Neutral position= 4.2 volts to 4.8 volts.
Rotate right function= 4.9 volts to 8.5 volts.
Rotate left function= 4.1 volts to .5 volts.
Test between pin 28 and 02 wire.
Pin 29 - Boom elevation input. Wire Y from boom joystick controller.
Neutral position= 4.2 volts to 4.8 volts.
Boom up function= 4.9 volts to 8.5 volts.
Boom down function= 4.1 volts to .5 volts.
Test between pin 29 and 02 wire.
Pin 30 - Accelerator input. Signal wire C from boom speed controller.
Proportional voltage. .5 volts= slow speed up to 7.5 volts= fast speed.
Test between pin 30 and 02 wire while operating jib, telescope or platform rotate junctions.
Pin 31 - Drive/ Boom function Enable- 12 volt input on wire 59B.
- Machine stowed and tilted= Boom up, riser up and telescope out functions allowed until limit switches
are activated (LS2, LS3 or LS4). Drive remains active.
- Machine elevated and tilted= All boom functions remain active. Drive is cut out.
Test between pin 31 and 02 wire.
Pin 32 - Telescope function selected. Input from wire 38A.
Neutral position= 3.58 volts.
Telescope in function= 4.83 volts.
Telescope out function= 2.41 volts.
Test between pin 32 and 02 wire.
Pin 33 - 12 volt input from 208CR1 on wire 8. Foot switch activated (inactive after 7 seconds= times out).
Test between pin 33 and 02 wire.
Pin 34 - Not used.
Pin 35 - Turret rotate right selected. Proportional output on wire 33 to turret rotate right valve 4H-33.
0 volts to 11.2 volts depending on position of joystick. Threshold= 6.9 volts.
Test between pin 35 and 02 wire while operating turret rotate right.

Table of Contents

Related product manuals