EasyManua.ls Logo

Skyjack SJ30AJE - 10 Platform

Skyjack SJ30AJE
190 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
23
SJ30AJE, SJ30ARJE 196274AF
Scheduled Maintenance Inspections Section 1 – Scheduled Maintenance
1.6-10 Platform
Platform Assembly (B)
Ensure there are no loose or missing parts and
there is no visible damage.
Ensure all fasteners are securely in place.
Ensure fall protection anchorage(s)
1
are
secure and there is no visible damage.
Ensure all railings
2
are properly positioned
and secured.
Ensure the gate/drop bar
3
is in good
working order.
Ensure the footswitch
4
is in good working
order and has not been modified, disabled or
blocked.
Ensure the AC outlet
5
has no visible damage
and is free from dirt or obstruction.
6
Platform Control Console (B)
Ensure all switches/controllers are returned to
neutral.
Ensure there are no loose or missing parts and
there is no visible damage.
7
Manuals
Ensure a copy of the operating manual and
other important documents are enclosed in the
manual storage box.
Check to be sure the manual storage box is
present and in good condition.
Ensure the manuals are legible and in good
condition.
Always return manuals to the manual storage
box after use.
1
7
6
2
3
4
5

Table of Contents

Related product manuals