EasyManua.ls Logo

Skyjack SJ30AJE - Page 161

Skyjack SJ30AJE
190 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
161
SJ30AJE, SJ30ARJE 196274AF
Base Section 5 – Procedures
Pin 11 - Enable out- Negative output on wire 208 to relays 208CR and 208CR1.
Test for negative at pin 11 while operating from base or upper controls.
Pin 12 - Enable in- 12 volt input on wire 8B from footswitch S6 or base enable switch S21.
Test between pin 12 and battery negative while activating footswitch or base enable switch.
Pin 13 - 12 volt input on wire 24 from left steer switch.
Test between pin 13 and battery negative while operating left steer.
Pin 14 - 12 volt input on wire 23 from right steer switch.
Test between pin 14 and battery negative while operating right steer.
Pin 15 - Negative output on wire 224 to left steer valve 4H-224.
Test pin 15 for negative while operating left steer. (Platform must be over drive axle)
Pin 16 - Negative output on wire 223 to right steer valve 4H-223.
Test pin 16 for negative while operating right steer. (Platform must be over drive axle)
Pin 17 - Variable negative output on wire 90 to battery condition light PL4.
(No light= Charged… Solid light= Warning… Blinking light= Limp mode)
Test for negative at pin 17.
Pin 18 - 12 volt input from platform Load cell on wire 162.
12 volts= within platform capacity. 0 volts= overload.
Test for continuity between pin 18 and battery negative while no load in platform. Refer to Load Sense
troubleshooting in section 5 for additional information.
Pin 19 - PMU accelerator input. Variable input from wire 70. 10-100% of maximum pump speed. (PWM signal)
Test for varied input at pin 19 while operating from upper controls.
Pin 20 - Base speed 1 input on wire 71. 70% of pump speed.
Test continuity on wire 71 between pin 20 and base terminal block.
Pin 21 - Base speed 2 input on wire 72. 50% of pump speed.
Test continuity on wire 72 between pin 21 and base terminal block.
Pin 22 - Base speed 3 input on wire 73. 8% of pump speed.
Test continuity on wire 73 between pin 22 and base terminal block.

Table of Contents

Related product manuals