EasyManua.ls Logo

Skyjack SJ6832 RTE - 10 Maintenance Support; General Components; AC Power Socket on the Platform; Folding Guardrail System

Skyjack SJ6832 RTE
112 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
28
SJ6832 RTE
221844ACAI
Section 3 – Familiarization General components
FAMILIARIZATION
3.4-10 Maintenance support
Use the maintenance support
1
when you do an
inspection of the lift mechanism or do maintenance.
Refer to section 6.9 for the procedure on how to use
the maintenance support.
1
3.5 General components
3.5-1 AC power socket on the platform
The AC power socket is a source of AC power on the
platform when the plug at the base is connected to
an external power supply.
3.5-2 Folding guardrail system
When you fold down this system, it decreases the
height of the fully-lowered MEWP to transport the
MEWP and/or to drive the MEWP through doorways.
Refer to section 6.8 for the procedure on how to fold
the guardrails.

Table of Contents