EasyManua.ls Logo

Skyjack SJ6832 RTE - 21 Do a Test of the Hybrid Power Pack (HPP) from the Platform (Optional Equipment)

Skyjack SJ6832 RTE
112 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
49
SJ6832 RTE
221844ACAI
Function Tests Section 4 – Inspections Before Operation
4.3-21 Do a test of the Hybrid Power Pack
(HPP) from the platform (optional
equipment)
1. Move the HPP on/off switch
1
to the on
position.
▪
Result: The HPP starts.
2. Move the HPP on/off switch
1
to the off
position.
▪
Result: The HPP turns off.
1

Table of Contents