49
SJ6832 RTE
Function Tests Section 4 – Inspections Before Operation
4.3-21 Do a test of the Hybrid Power Pack
(HPP) from the platform (optional
equipment)
1. Move the HPP on/off switch
1
to the on
position.
▪
Result: The HPP starts.
2. Move the HPP on/off switch
1
to the off
position.
▪
Result: The HPP turns off.
1