Section 4 – Inspections Before Operation Visual and daily maintenance inspections
4.2-9 Lift mechanism
Do the inspection that follows in sequence:
1
Sliders and rollers
▪
Make sure that the sliders and rollers on the
left and right side of the MEWP are correctly
attached.
▪
Make sure there is no visible damage.
▪
Make sure there is no dirt or blockages in the
slider or roller paths.
1. Raise the platform (refer to section 5.4) and
deploy the maintenance support (refer to
section 6.8).
2
Maintenance support
▪
Make sure that the maintenance support
is correctly attached and show no visible
damage.
3
Scissor assembly
▪
Make sure that the scissor assembly shows
no signs of visible damage, deformation, or
cracks in the weldments.
▪
Make sure all the pins and fasteners are
correctly installed.
▪
Make sure that the cables and wires have the
correct routing, and show no signs of wear
and/or physical damage.
4
Scissor bumpers
▪
Make sure that the bumpers are correctly
attached and have no visible damage.
5
Lift cylinders
▪
Make sure that the lift cylinders are correctly
installed.
▪
Make sure there are no loose or missing
fasteners.
▪
Make sure there is no indication of leaks or
damage.
6
Angle transducer
▪
Make sure that the angle transducer is
correctly attached.
2. Retract the maintenance support into its storage
bracket. Refer to section 6.8.
3. Fully lower the platform.
2
5
1
1
4
3
4
6