Section 6 – Additional Procedures Move the MEWP for transport
1
Figure 05 Forklift lift locations
6.4-2 Hoist the MEWP
WARNING
Only qualified riggers must operate the machinery
during a lift.
When you hoist the MEWP, you must:
▪
Turn the main power disconnect switch to the
off position.
▪
Close and tightly latch the engine compartment
door.
▪
Retract the extension platform. Correctly insert
the lock-pin(s).
▪
Attach the platform control console to the
mounting bracket, or remove the platform
control console
▪
Remove all personnel, tools, and materials from
the platform.
▪
Attach the rigging to all four lift points
1
. Refer
to Figure 07.
Figure 06 Appropriate method to hoist