SMA Solar Technology AG Electrical Connection
Installation Guide SB20_25_30HF-IEN102911 47
4. Push the threaded joint to the thread and screw into place.
The DC plug connectors are now assembled and can be connected to the inverters, as
described in section 6.3.4”Connecting the PV Generator (DC)” (page49).
If the conductors are not visible in the
hollow cavity, the cable is not in the correct
position.
Loosen the clamping clip using a
screwdriver.
The width of the screwdriver should be
3.5 mm.
Remove cable and start again from step 1.
Result Action