EasyManua.ls Logo

SMA Sunny Boy 3000US - Page 27

SMA Sunny Boy 3000US
106 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Mounting Mounting Procedure
SB3000US-4000US-11-SE1607 SMA America 3-9
Note: The diameter of the holes you drill must match the
hardware you are using to mount the Sunny Boy. For
example, if you are mounting the Sunny Boy to a concrete
wall, the hole diameter should be approximately the same as
the outside diameter of the concrete anchors you intend to
use. If you are mounting the Sunny Boy on a wall that has
wooden studs inside it, the hole diameter should be the
correct size for the lag screws you intend to use to mount the
bracket. If you are installing the Sunny Boy outside, it is
recommended that the lag screws be made of stainless steel,
and the diameter of the screws closely match the diameter of
the holes in the wall-mounting bracket. Make sure that the
screws are long enough to penetrate the wall to a depth of 1 and 1/2”.
5. Insert the screws through the holes in the wall-mounting bracket and into the
holes you drilled in the wall. Tighten the screws until the bracket is held firmly
against the wall (see Figure 3-4). Do not overtighten the screws.

Table of Contents

Related product manuals