EasyManua.ls Logo

SMA SUNNY BOY 4000-US - Page 87

SMA SUNNY BOY 4000-US
100 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SMA America, LLC 11 Cleaning and Care
Installation Manual SB30-40-US-IA-en-33 87
^
Figure 28: Position of the ground fuse
Additional required mounting material (not included in the scope of delivery):
1 functional and correctly designed ground fuse must be available
1. Open the inverter (see Section 9.1).
2. Remove the fuse extractor with ground fuse from the
fuse holder.
3. Remove defective ground fuse from the fuse extractor and insert a new ground fuse into the fuse
extractor. Ensure that the ground fuse is functional and is the correct size.
4. Insert the fuse extractor with the new ground fuse
into the fuse holder. Note the type of grounding of
the PV array (see Section 6.4.3 "Grounding the DC
Input", page 44).
5. Close the inverter (see Section 9.2).
6. Commission the inverter (see Section 8).
Position Designation
A Fuse extractor with ground fuse

Table of Contents

Other manuals for SMA SUNNY BOY 4000-US

Related product manuals