EasyManua.ls Logo

SMART Board 685ix - Chapter 1: Installing the SMART Board 685 ix System; Pre-Installation Steps and Requirements; Mounting the SMART Board 685 ix System on FUWM-600 Wall Mount; Installing the Projector Mount and Bracket

SMART Board 685ix
30 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 1
Installing your SMART Board 685ix
Premium interactive whiteboard
system
IMPORTANT
Use the instructions in this guide to install your SMART Board 685 interactive
whiteboard, UX60 projector and extended control panel (ECP) on the fixed
unit wall mount 600 (FUWM-600).
The instructions in your SMART Board 685 interactive whiteboard box do not
include instructions for installing the UX60 projector or ECP, and the
instructions in the SMART Board 685ix and SBD685 Interactive Whiteboard
System document do not show how to mount the interactive whiteboard or
projector on the wall mount.
Refer to the FUWM-600 Computer installation instructions included with the
wall mount, document 99-01035-20, to install the wall mount.
In this chapter
Refer to these topics for information about mounting your SMART Board 685ix
interactive whiteboard system on the FUWM-600.
Before installing the SMART Board 685ix interactive whiteboard system on
page 2
Environmental requirements on page 2
Verify the installation of the FUWM-600 wall mount and the computer on
page 2
Mounting your SMART Board 685ix interactive whiteboard system on a
FUWM-600 on page 3
Tools required on page 3
Installing the projector mount and wall mount bracket on page 4
Installing the ECP on the interactive whiteboard’s frame on page 6

Table of Contents

Other manuals for SMART Board 685ix

Related product manuals