EasyManua.ls Logo

SmartLine SL1620 - Num Start; Zn:zn Dly; MV:zn Dly; MV;Zone

SmartLine SL1620
40 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
20
http://support.weathermatic.com
6.10 Num Start
This SmartLine® feature allows you to select the number of
Watering Program Start Times that you want to appear at
Program Start Times on the dial. The default number of start
times shown is 3. To select 4 to 8 start times, go to Advanced
Functions, NUM STRT. Press Next to view the default of 3 start
times. Scroll the UP/DOWN buttons to select 4 to 8 start times
to be visible on the dial. Return the dial to Run.
6.11 Zn:Zn Dly
This function allows user to set delay times between zone starts
for use in systems with slow closing valves or pump systems that
are operating near maximum flow or have slow well recovery.
UseUP and DOWN buttons to change value. Adjustable in one-
minute increments from 0 (the SmartLine® controller default
setting) to 30 minutes; adjustable in 10 minute increments from
30 minutes to 3 hours.
6.12 Mv:Zn Dly
(Master Valve Advance Open
and Delayed Close):
This function allows the user
to set a delay time between
the opening of the master
valve and the opening of the
first zone valve as well as a
delay between the closing of
the last zone valve and the
closing of the master valve.
Use the NEXT button to enter
menu. Select setting for the
ON Delay or OFF Delay by
pressing NEXT. Use UP and DOWN buttons to select delay time.
Use arrow buttons to set ON Delay time from 0 seconds to 1
minute in 1 second increments. OFF Delay can be set from 0
seconds to 3 minutes in 1 second increments.
6.13 Mv/Zone
This feature is used to indicate which zones will use the master
valve/pump start output. Use NEXT button to set each zone ON
or SYSTEM OFF (SmartLine® controller default is master valve
ON for all zones). Use UP and DOWN buttons to select ON or
OFF. Use NEXT button to select zone.
Caution: If an unused zone is turned on and activates a pump
start relay, the pump may overheat or cause a pipe to burst. To
prevent operating a pump with no flow (dead heading), make
sure all unused zones are set to OFF.
Advanced Menu 6.0
Note: The Master
Valve/Pump
Start circuit will
operate during
the first 5 seconds of any
programmed delay to aid in
closing of the valve and to
avoid unnecessary cycling
of the pump. The 5 second
period is programmable in
the MV:ZN DLY setting. (See
Section 6.7)

Related product manuals