Page 2 - TM12
MAINTENANCE
3. The charger turns on automatically after a short delay. Look through the charge indicator cut-
out to check the state of charge. The state of charge categories is stated below;
0-50% Charge:
- First light - BLINKING -
- Second and Third light - OFF
50% - 75% Charge:
- First Light - ON
- Second light - BLINKING -
- Third light - OFF
75% - 100% Charge:
- First and Second light - ON
- Third light - BLINKING -
Charge complete
- All lights - ON
The charger automatically shuts down to low current after charging is complete and all lights turn
on. Low current charging (equalizing charge) carries on for 3-4 hours after which the current shuts
off completely.
4. Lights remain on until the AC power supply is disconnected.
NOTE: The battery charger circuit must be used with a GFI (Ground fault interrupt) outlet.
NOTE: DO NOT operate the machine while the charger is plugged in.
INSPECTION AND MAINTENANCE SCHEDULE
The complete inspection consists of periodic visual and operational checks along with periodic
minor adjustments that assure proper performance. Daily inspection will prevent abnormal wear
and prolong the life of all systems. The inspection and maintenance schedule should be performed
at the specic intervals or at intervals to suit the relevant national body, whichever is the lesser.
Inspection and maintenance shall be performed by personnel who are trained and familiar with
mechanical and electrical procedures.
Table 2-2 below is a daily preventative maintenance checklist. The checklist has been designed for
the machine service and maintenance. Please photocopy and use the checklist when inspecting
the machine.