3.9.4 Control connections.
In order for units connected in a parallel conguration to operate correctly, control cables are required to exchange
data between the various UPS units making up the parallel system, for management of correct load sharing and
synchronisation logic.
The cables in question are supplied with the UPS in case of standard parallel setting or are attached to the parallel
kit in case of later upgrading of the system.
1BSBMMFMDPOöHVSBUJPONVTUPOMZCFBDUJWBUFECZ40$0.&$614RVBMJöFEQFSTPOOFMJOFBDIDBTFBSSBOHFUIF
running of the control cables in the relative cable run as shown in gure 3.9.4-1, leaving the connector(s) uncon-
nected (in the central UPS one incoming and one outgoing control cable must be used).
3.9.4-1
A
B
C
A Control cables cable run.
B i1BSBMMFMCVTuDBCMFMFBWFBQQSPYBDNDBCMFMFOHUIBUUIFFYJUPGUIFDBCMFSVO
C Label for unit positioning.