2.8 2.8 OperationOperation
▶
Contact with the electrical grid or the device’s terminals may result in an electric
shockorre!
▶
Do not touch the terminal or the conductor which is connected to the electrical grid.
Follow all instructions and observe all safety documents that refer to the grid connection.
▶
While the inverter is being operated, several internal components will become very
hot. Wear protective gloves! Keep children away from the device!
▶
The PV generator must be earthed in accordance with the requirements of the local
power grid operator!
▶
For reasons of personal safety, we recommend that all PV module frames and
inverters of the PV system are reliably earthed.
▶
Ensure that the input voltage does not exceed the maximum permissible voltage.
Overvoltage may cause long-term damage to the inverter, as well as other damage
that is not covered by the warranty!
2.9 2.9 Repair and maintenanceRepair and maintenance
▶
Beforecarryingoutanyrepairwork,rstswitchotheACcircuitbreakerbetween
the inverter and power grid, and then the DC switch.
▶
AfterswitchingotheACcircuitbreakerandtheDCswitch,waitaminimumof5
minutes before starting any maintenance or repair work.
▶
Following the elimination of any faults, the inverter should be fully functional once
more. Should any repairs be required, contact a local authorised service centre.
▶
The internal components of the inverter must NOT be opened without the relevant
authorisation. Shenzhen SOFARSOLAR Co., Ltd. assumes no responsibility for any
resulting losses or defects.
2.10 2.10 WarrantyWarranty
▶
Do not open the inverter or remove any of the labels.
Otherwise, SOFARSOLAR shall assume no guarantee.