EasyManua.ls Logo

SOLIS S6 Series - PE Cable Installation

SOLIS S6 Series
50 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
User Manual
4. Installation
11
An external ground connection is provided at the right side of inverter.
Prepare OT terminals: M4. Use proper tooling to crimp the lug to the terminal.
Connect the OT terminal with ground cable to the right side of inverter. The torque is 2N.m.
4.3 PE Cable Installation
Figure 4.5 Connect the external grounding conductor
Grounding screw
Grounding screw

Other manuals for SOLIS S6 Series

Related product manuals