T200, T380, or T680 Transporter Replacement Complete the Replacement
August 2012 Replacing the Transporter—Spectra T200, T380, and T680 Libraries
31
COMPLETE THE REPLACEMENT
After you complete the necessary steps to reassemble the library, the steps
required to complete the replacement are the same for both access
methods.
If you powered off the library, begin with Power On the Library.
If you did not power off the library, begin with Test the New
Transporter on page 32.
Power On the Library
1. Reconnect the AC power cords to the connectors on the back of the
library and then turn on the AC power switches (see Figure 4 on
page 9).
2. Press and hold the front panel power button until the button’s LED
illuminates. Wait while the library completes its power-on sequence,
which takes about five minutes (depending on the library
configuration). During the power-on sequence the library initializes all
of its installed components.
Figure 32 Press and hold the front panel power button.
Power button