34 SPECTROMAXx —
7.2 Maintenance schedule
Start of work Tasks to be performed
1. Check the argon supply. The min. pressure in the bottle is 10 bar.
2. Diagnosis system - maintenance or
check the number of measurements.
Will be specified by the diagnosis system.
3. Check the water level in the gas-
washing bottle.
Top up/replace, see page 47.
4. Check the burn spot. Visual inspection.
Measuring procedure Tasks to be performed
Clean the electrode.
Use the small wire brush to clean the
electrode after each spark test.
Monthly maintenance work
Change water in gas-washing bottle. See page 47.
Clean the UV optics light inlet window. See page 35
Clean the air optics light inlet window. See page 37.
Clean the filter mats and replace if
necessary.
See page 49.
As required
iCALizing the measuring device (iCAL) See page 31.
Replacing the iCALization sample. See page 51
Clean spark stand. See page 40.
Clean/replace the filter insert of the filter
bottle.
See page 45.
Replace the filter bottle. As required.