Maintenance Waukesha Cherry-Burrell
®
Brand C-Series Pump
Page 40 95-03008-IEC 01/2019
4. Figure 87 shows the key installed (arrow). Lightly coat the
threads on the stub shaft with anti-
seize.
5. Install the impeller onto the stub shaft as shown.
NOTE: C-2
14 shown. C-218 and C-328 impellers have 4
blades.
NOTE: Do not install any O-rings at this time.
6. Install the impeller nut onto the stub shaft.
NOTE: D
o not install any O-rings at this time.
7. Tighten the impeller nut by hand.
8. Place a 0,060 inch shim between the impeller and the back-
plate of the pumps.
Figure 87 - Key installed
Figure 88 - Install impeller
Figure 89 - Install impeller nut
Figure 90 - Place shim