51
734.843 | 10.48
EN
Installation instructions(Short version)
Installation
1 2 3
4 5 6
7 8 9
10
(Optional)
The AC cable must remain voltage-free The AC cable must remain voltage-free
1. Optional, only when installing slaves
2. AC cable must remain voltage-free
1. Optional, only when installing slaves
2. AC cable must remain voltage-free
1. Optional, only when installing slaves
2. AC cable must remain voltage-free
The AC cable must remain voltage-free
ATTENTION
The electrical connections must be made in the correct
order:
Connect the equipment to the grid
Connect the PV generator
Connect power cable safety switch