8.1 Commissioning work
The following requirements must be fullled to carry out commissioning work and preparatory work must be completed.
Preconditions
Tool Material Protective equipment
• none • none • none
Preparatory work
1. Completed installation with leak test
Picture
Description
Automatic drain Mechanically open
1. Turn the knurled-head screw on the
oat drain from >>mechanically open<<
counter-clockwise (left) to >>automatic
drainage<<
Picture Description
1 3 2
2. Slowly open the shut-o valve [1] on the
inlet side
3. Slowly open the shut-o valve [2] on the
outlet side
4. Close the shut-o valve [3] on the bypass
line