EasyManua.ls Logo

Sungrow SG3.0RT - Meter Connection; Assembling the COM Connector

Sungrow SG3.0RT
127 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
48
5.9 Meter Connection
In a single inverter scenario, the Meter (A2, B2) terminals are designed to connect to the
Smart Energy Meter for the feed-in power function. The export control functionality has not
been tested to AS/NZS 4777.2:2020.
5.9.1 Assembling the COM Connector
step 1 Unscrew the swivel nut from the connector.
step 2 Take out the terminal block.
step 3 Remove the seal and lead the cable through the cable gland.
step 4 Remove the cable jacket and strip the wire insulation.
5 Electrical Connection User Manual

Table of Contents

Other manuals for Sungrow SG3.0RT

Related product manuals