EasyManua.ls Logo

SUNSTONE Linear DC - Schedules Tab

SUNSTONE Linear DC
42 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
14
Schedules Tab
PRECHECK SCREEN
e Linear DC is equipped with an optional “Precheck” feature that enables the welder to test the
resistance of the weld path before a weld is performed. is allows the weld controller to notify
the user if the chosen weld parameters are attainable with the connected weld path resistance.
e user has the option to have the welder stop operation when the “Precheck” fails or to continue
welding with a warning message or signal. *is is useful in high volume production or automated
systems.
Enable - To enable this feature, select the “Precheck” button and then ensure that the box
next to “Enabled” has a check mark in it.
Time - This displays how long the voltage will be applied during the precheck.

Related product manuals