EasyManua.ls Logo

Suzuki RM85/LK5 - Safety Check Out and Pre-Delivery Inspection; Engine and Transmission Checks; Chassis Component Checks; Electrical System Checks

Suzuki RM85/LK5
28 pages
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
27
SAFETY CHECK OUT
ENGINE AND TRANSMISSION
CHASSIS
COLD INFLATION TIRE PRESSURE
ELECTRICALS
ROAD TEST INSPECTION
After completion of the setting-up the motorcy-
cle all the following items should be double-
checked to confirm that the operation and func-
tion of the motorcycle are satisfactory. Now,
setting-up the motorcycle and pre-delivery
inspection have been completed and the
motorcycle can be passed to the customer.
ITEM MEASURE SPECIFICATIONS
Transmission oil Check/Fill 550 ml
Fuel/Oil premixture
ratio
Oil type 30:1
Fuel tank Drain/Fill 5.0 L
Throttle cable Check/Adjust 2.04.0 mm
Exhaust system Leakage
Fuel system
connection
Circlip/Leakage
Engine coolant Leakage/Level 570 ml
ITEM MEASURE SPECIFICATIONS
Clutch cable Check/Adjust 1015 mm
Disc brake (s) Clean/Fluid level
Front brake lever Check/Adjust 520 mm
Rear brake pedal Check/Adjust
Height:
010 mm
Drive chain Lubricate/Adjust 4050 mm
Oiling point All necessary points
Wiring and cable Routing/Operation
Wiring connectors Clean/Tight
Front fork
Air pressure/
Operation
Rear shock
absorber
Operation
Tighten all nuts
and bolts
Torque those listed
in this manual
Cotter pins and
circlip
Fasteners, Check
FRONT REAR
70110 kPa
0.71.1 kg/cm
2
1016 psi
70110 kPa
0.71.1 kg/cm
2
1016 psi
ITEM CHECK FOR
Switch Operations
Operation
Engine stop switch
ITEM CHECK FOR
Engine
Starting/Acceleration/
Smoothness/Noise
Transmission Operation/Noise
Drive chain Operation/Noise
Clutch Operation/Noise
Brake Front/Rear, Operation/Noise
Steering Stability
Suspension Operation
Control cables Operation/Proper return
Leakage Fuel/Oil/Exhaust/Coolant

Related product manuals