SV 104 USER'S MANUAL_DRAFT_______________________________________________
_
55
Setting hour and day of the measurement’s start
The Start Time” determines the time for the measurement to start. The required hour and minute can be
selected.
The Start Day determines the date of the measurement start. The timer can be programmed up to one
month ahead and during the date setting the current state of the Real Time Clock is taken into account. The
required date can be selected. Make sure to check that the real time clock settings for the measurement
location are correct before beginning a delayed timer measurement.
Selecting the period between two consecutive measurements
The Repetitions Number” position is displayed when Regular” mode is selected. This parameter can be
programmed from 1 up to 100. The required date can be selected.
There is also possibility to program two independent PAUSES in the form of Relative, or Absolute time
programming. See Figure 5-17 for detailed settings in magnified area.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Svantek SV 104 and is the answer not in the manual?

Svantek SV 104 Specifications

General IconGeneral
BrandSvantek
ModelSV 104
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals