EasyManua.ls Logo

Sym Quad Lander 250 - Page 175

Sym Quad Lander 250
223 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
15. STEERING / FRONT SUSPENSION
15-4
Loosen 2 screws, and then remove handle left
switch and choke hosing.
Remove switch wire band.
Remove handle mounting bolt, and then remove
the handle upper holder, handle.
Remove 2 nuts to remove handle under holder
and meter bracket.
Installation
Install in reverse order of removal procedures.
Torque value:
Handlebar under holder nut 4.0kgf-m
Handlebar upper holder bolt 2.4kgf-m
2 screws
To this chapter contents
2 Nuts
4 socket bolts

Table of Contents

Related product manuals