EasyManua.ls Logo

Symmetricom 5071A - Operation Verification

Symmetricom 5071A
202 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4. Replacing Assemblies - Disassembly and Reassembly
To Remove A17 CBT Assembly
171
Operation Verification
1 Be sure the printer/terminal is on and that there will be a hard copy of the
information captured.
2 Connect power to the instrument, noting the time.
3 If the message “Cs Oven is Up” does not appear within 25 minutes,
there may be a problem with the connections to the A2 CBT Controller
assembly. Remove all power, disconnect the internal-standby battery,
and re-check your work.
4 When the message “Operating Normally” appears, the instrument is
operating. No further adjustments are needed.

Table of Contents

Other manuals for Symmetricom 5071A

Related product manuals