4. Replacing Assemblies - Disassembly and Reassembly
To Remove A17 CBT Assembly
171
Operation Verification
1 Be sure the printer/terminal is on and that there will be a hard copy of the
information captured.
2 Connect power to the instrument, noting the time.
3 If the message “Cs Oven is Up” does not appear within 25 minutes,
there may be a problem with the connections to the A2 CBT Controller
assembly. Remove all power, disconnect the internal-standby battery,
and re-check your work.
4 When the message “Operating Normally” appears, the instrument is
operating. No further adjustments are needed.