EasyManua.ls Logo

Symmetricom 5071A - Page 62

Symmetricom 5071A
202 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2. Service
Top-Level Diagnostic Tree (Diagnostic Section 1)
46
1.1.3 Tube PROM Test
1 Remove power from the instrument.
2 Disconnect A2P3 from A2J2.
3 Apply power to the instrument.
4 Verify presence of +5 V ( 0.5) at pin 1 on A2J2 to chassis
ground.
5 Use a digital storage scope or logic analyzer (trigger set to 2.5V,
DC coupled, timebase to 50 us/div., no auto trigger) to verify the
signals are toggling at A2J2 pins 2 and 3 following activation of
the reset button on top of A3. The pulse levels should be
approximately 4.0 Vp-p. (Refer to the A2 connector pinout
diagrams at the beginning of the A2 diagnostic trees opposite
procedure 3.1.1.1.0.)
QUESTION: Is there +5 V at pin 1 and a toggling signal present on
pins 2 and 3 of A2J2?
If Yes: CBT ROM may be defective: contact Symmetricom for assistance.
If No: Remove power, replace A2, and retest.

Table of Contents

Other manuals for Symmetricom 5071A

Related product manuals