24
Rev. 12GB0712
SYSTEMA S.p.A.
AIRTIGHT GAS CONVECTORS
Side on which the
air box has to be
connected
Lift the pre-cut tongue to
prepare the support for
the housing.
1) side exhaust back connector
2) exhaust pipe hole
3) hole for cage nuts or screw anchor
4) gas convector
5) air box
6) sealing
7) female 60 Ø collar for exhaust fixing
8) pre-cut tongue to support the hou-
sing
9) sealing
Installation of King with side wall exhaust pipe
1) Drill (Ø60) the wall following the instructions at A
and B measures (see drawing 29)
2) Fix on the wall the back connector for the side wall
exhaust pipe (1) with the exhaust pipe hole (2) on
the right or on the left keeping the centre of the hole
Ø 60
3) Put the 4 cage nuts inside the fitting holes (3)
4) Fix on the gas convector (4) the air box (5) using
the 4 screw included in the equipment
5) Fix the box (5) to the female Ø60 collar (7) using
the 4 screws included in the equipment - don't for-
get to put the sealing (9) before the screw
6) Lift the 4 pre-cut tongues (8) placed on the back
connector (1)
Draw 28