C712 Operator Training -26-
Parts
Three Months Parts Replacement
Every 3 months replace the following parts:
Design Caps Mix Feed Tube O-Ring
Draw Valve O-Ring Prime Plug O-Ring
Draw Valve H-Ring (Center)
Pump Drive Shaft O-Ring
(Small)
Beater Drive Shaft Seal
Pump Drive Shaft O-Ring
(Large)
Freezer Door Gasket Pump O-Ring
Front Bearing Pump Valve Gasket
Front Beater Shoes Scraper Blades
Mix Feed Tube Check Ring
Most of the listed parts are available in the tune-up kit.
Refer to the Taylor Operator Manual or local Taylor Distributor for part numbers.
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________
___________________________________________________________________________