Operator's Manual
First Edition • Second Printing
Part No. 116692 RL4000 • TML-4000 29
Setup
Make sure the machine is set up according to the
Setup procedure in the Function Tests section.
Start the Engine
Note: The main circuit breaker and the light
switches must be off before starting the engine.
Note: There must be fuel in the fuel tank in order to
start the engine.
Engine Start
1 Move the ignition switch to the ACC position.
2 Press and hold the prime button for 7 seconds.
3 Move the ignition switch to the run position.
4 Press and hold the prime button for 15 seconds.
Note: Never preheat the engine for more than 30
seconds, damage may be done to the glow plugs.
5 While holding down the prime button, move the
ignition switch to engine start position.
Note: To avoid damage, never operate the starter
for more than 45 seconds when starting the engine.
Engine Shutdown
1 Turn the lights off using the individual light
switches.
Note: After being turned off, the lights must be
allowed to cool down before turning them on again.
This cool down period can take betweeb 10 and 25
minutes depending the ambient temperature.
2 Allow the engine to run for 1 to 5 minutes under
no load.
Note: Never shut the engine down while under load.
This can damage the AC generator.
3 Turn the ignition switch to the engine off
position.
Operating Instructions
Operation of Tower
1 Remove the cotter pin and the upper the
retaining pin from the top of the mast.
2 Remove the cotter pin and the retaining pin from
the mast support.
3 Turn the raise/lower winch handle clockwise until
the mast reaches vertical position.
4 Insert the lower retaining pin through the mast
supports. Insert the cotter pin through the
retaining pin.
5 Turn the extend/retract winch handle clockwise
to extend mast sections.