EasyManua.ls Logo

Tiger 370 CNC--MR - Page 46

Tiger 370 CNC--MR
180 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5--11
36
" start operation.
At this stage it is possible to adjust, according to the type of material, the 2
parameters which influence the cut: the disk rotation speed and the head
downstroke speed, through the relative potentiometers on the control panel.
Now the blade starts, the cutting cylinder is under pressure and the lubricant/
coolant supply starts.
In this phase, pressing the head dowstroke button, the FCTA spot is deleted.
" When the machine arrives at the end of the cut it is necessary to memorize
the FCTA position, by pressing the relative button;
" when the machine reaches the position to start cutting again, the symbol to
indicate the FCTA upstroke limit will re---appear on the display.
SEMI-AUTOMATIC
CURRENT CYCLE
FCTA
" At the same time, the disk will stop and the cutting head will return to the
start of cut position (FCTI).
" When the head arrives at the start of cut position, the display will indicate the
FCTI position.
SEMI-AUTOMATIC
X=
θ° =
W=
F = 153
S=
kg= 10
DL= 0
SL= 3
AM= 0.0
A = 0.1
T= 0:0
TT= 0:10
CURRENT CYCLE
F9 = MAIN MENU
F5 = RESET TT
FCTI
" Next, the machine automatically opens the cutting vice.
The machine is ready to carry out a new cutting cycle.
N.B.
N.B.

Table of Contents