MEP S.p.A.
5--14
39
Use and maintenance manual TIGER 370 CNC--MR
" The second series of operations are to fit the material to be cut: place the ma-
terial between the vice jaws, and draw one end under the blade in order to
perform an initial cut to initialize the cuts.
" After inserting the material, bring the moving jaws for the cutting and feeder
vices to within 2
÷3 mm of the workpiece;
" activate the automatic pneumatic vices to block the piece, using the two vice
closing buttons;
" check that the piece is well blocked;
to avoid deformation when the tubes are thin walled, or the blocking force of the
vices is not sufficient for materials which are particularly hard or with articulated
sections, adjust the vice pressure by means of the regulator located inside the
base.
Preparing to cut
" Close the protection and press the reset button;
" adjust the cutting stroke by memorizing the head upstroke limit (FCTI): bring
the cutting head near the material using the head downstroke button.
" Memorize the cutting start position by pressing the FCTI (Head Upstroke
Limit) button. The FCTI indication will appear at the top of the display on
the right hand side.
AUTOMATIC
X=
θ° =
W=
F = 153
S=
kg= 10
DL= 0
SL= 3
AM= 0.0
A = 0.1
T= 0:0
TT= 0:10
F0 = PGR. SINGLE
F9 = MAIN MENU
F8 = BLADE THICKNESS
F7 = SING/CONT CYCLE
F6 = EXEC. STEP/CONT
CUTS
EXEC.
θ CUTS
PROG.
SINGLE CYCLE
RUN/PROG=PROGRAMMING
PGR. NO MEASUR. CUTS PROG.
10 512,8 2343
OPERATING CYCLE
FCTI
Programming cuts
Once the material to be cut has been inserted and blocked, bring the cutting head
to the FCTI (Head Upstroke Limit) position, set the cutting dimension indicated