EasyManua.ls Logo

Toro 2024 - Bore Path Planning Details; Entry Pitch and Depth Considerations

Toro 2024
100 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1
g021765
Figure25
1.20cm(8inches)
Thisexibilityisoftenratedinmaterialsasaminimum
bendradius,whichistheradiusofthecircleformedifthe
materialorpipes,connectedtogether,werebenttoform
agiantcircle.Theminimumradiusofacirclemadewith
thepipeusedwiththismachineis31m(101ft).
Entrypitch
Theentrypitchistheangleatwhichthemachine
enterstheground.Withthetracksonlevelground,the
stabilizersdown,andthestake-downplateontheground,
thedrillframeangleisabout15degreesora27%pitch.
Thispitchwillchangedependingontheslopeofthe
groundandotherfactorsofthejobsite.Youcanalso
reducethispitchabitbybuildingupthegroundunder
thestake-downplatebeforepositioningthemachine.
Youcandeterminetheactualpitchofthedrillframeby
placingthedrillbitandsondehousingontheframeand
thenusethereceivertodisplaythepitch.
Thesteeperyourentrypitchis,thedeeperyourborewill
havetobeduetothelimitationsofthepipeexibility.
Typicallyyouneedtoinsertthedrillandatleast1/3ofa
pipeintothegroundbeforeyoucanstartsteeringtoward
thebeginningoftheborepoint.Figure26,Figure27,
andthefollowingtableillustratetherelationshipbetween
entrypitchanddepth.
1
2
3
g021766
Figure26
1.26%pitch3.76cm(30inches)
2.3m(10ft)
2
3
g021767
1
Figure27
1.18%pitch3.53cm(21inches)
2.3m(10ft)
35

Table of Contents

Related product manuals