EasyManua.ls Logo

Toro 2024 - Drilling the Bore; Starting the First Pipe

Toro 2024
100 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SettingUpthePumptoUseaNaturalWaterSource
Tosetupapumptouseanaturalwatersource,youmust
ensurethatyouusetheY-screentolterallmaterialsother
thanwater.
ToinstalltheY-screenperformthefollowingtasks:
1.Removethepump-inletcap(Figure48).
Figure48
1.Pumpthreads3.Y-screen
2.Pump-inletcap
2.AligntheY-screenwiththethreadsonthepump
(Figure48).
3.RotateandtightentheY-screenontothepump.
4.AttachthehosetotheY-screen,andbeginpumping
fromthenaturalwatersource.
DrillingtheBore
StartingtheFirstPipe
1.Ensurethatallbystandersareawayfromthemachine
andthattheexit-sidelockoutisOn.
2.Movethedrillcarriagefullydownthedrillframeand
spraythespindlethreadswiththreadjointcompound,
thenreturnthedrillcarriagetotheupperendofthe
frame(Figure43).
Figure49
1.Drillspindle
2.TJC-applicatornozzle
3.Rotatethepipegrippertotherstrowofpipesin
thepipeholderbyaligningtherowindicatortorow
number1.
4.Lowerthepipeelevatorstoloadapipeintothepipe
gripper.
5.Rotatethepipegripperwiththepipetowardthedrill
frame,andextendthepipeuntilthepipeiscentered
overtheframeandinfrontofthespindleonthedrill
carriage.
6.Rotatethedrillspindleclockwiseandmovethecarriage
slowlyforwardtoinsertthespindleintothefemaleend
ofthepipe(Figure50).
49

Table of Contents

Related product manuals