- 54
DRIVE INSTALLATION DRAWINGS (cont’d)
Frame 3 drive lifting and assembly
TOW MOTOR SLOTS
T
R
A
N
S
F
O
R
M
E
R
S
E
C
T
I
O
N
I
N
V
E
R
T
E
R
S
E
C
T
I
O
N
TO MOVE THE SECTIONS USE A FORKLIFT OF ADEQUATE CAPACITY
LIFT FROM THE SLOTS IN THE CHANNEL BASE ON EACH SECTION.
MAKE SURE THE FORKS EXTEND ENTIRELY THROUGH THE SECTION.
NOTE :OVERHEAD LIFTING PROVISIONS ARE ALSO PROVIDED
AFTER THE SECTIONS ARE IN PLACE, BOLT TOGETHER WITH WITH 1/2" HARDWARE.
INSTALL THE MAIN AND DC BUS LINKS AND THE CONTROL CONNECTOR
THEN INSTALL AND WIRE THE FAN ASSEMBLIES.
FOR LIFTING THE SECTION USE THE TRANSFORMER LIFTING EYES.
1/2" BOLT TOGETHER HOLES (6)
FOR LIFTING USE THE LIFTING ANGLES
(WITH CELLS REMOVED)
FAN ASSEMBLY
FAN CONTROL/POWER WIRE CONNECTOR
AND MOUNTING HOLES
CONTROL CONNECTOR
MAIN AND DC BUS LINKS