- 71  
 
DRIVE INSTALLATION DRAWINGS (cont’d) 
Frame H4P module lifting and installation continued 
 
PC94060P194
Power Module Installation
1. Lower lifter tray to ground. Roll Power Module onto tray. Secure Power Module.(B)
2. Raise tray above Power Module support pan. Lower tray, inserting pins into holes in 
front edge of support pan. (A) Set truck brake.
3. Unlatch Power Module (B). Roll Power Module from truck onto enclosure rails. 
A
B
Pin in front 
edge of lift 
tray
Power 
Module 
support pan
Power Module Lifting
For lifting the Power Module after it is out of 
the Cubicle use Lifting Attachment 
GCI6724G055 and a lifting device rated at 
1000 lbs. or more.
Secure Lifting Attachment to Power Module 
with (4) ½ -13 Bolts.
Lifting Attachment
Power Module Reconnection 
1. Reverse the procedure followed during disconnection and removal of Power Module.
2. Ensure that control signal cable and 120VAC supply cable are properly reconnected.
3. Reinstall all hardware previously removed.
4. Torque bus link connections (5/16-18 hdwr) to 10-15 ft-lbs.