3 Installation
3.1 Mechanical Installation
3.1.1 Side-by-side Installation
The frequency converter can be mounted side by side but requires the clearance above and below for cooling.
Power [kW (hp)] Clearance above/below [mm (in)]
Size IP class 3x200–240 V 3x380–480 V 3x525–600 V
TR150
H1 IP20 0.25–1.5 (0.33–2) 0.37–1.5 (0.5–2) – 100 (4)
H2 IP20 2.2 (3) 2.2–4 (3–5) – 100 (4)
H3 IP20 3.7 (5) 5.5–7.5 (7.5–10) – 100 (4)
H4 IP20 5.5–7.5 (7.5–10) 11–15 (15–20) – 100 (4)
H5 IP20 11 (15) 18.5–22 (25–30) – 100 (4)
H6 IP20 15–18.5 (20–25) 30–45 (40–60) 18.5–30 (25–40) 200 (7.9)
H7 IP20 22–30 (30–40) 55–75 (70–100) 37–55 (50–70) 200 (7.9)
H8 IP20 37–45 (50–60) 90 (125) 75–90 (100–125) 225 (8.9)
H9 IP20 – – 2.2–7.5 (3–10) 100 (4)
H10 IP20 – – 11–15 (15–20) 200 (7.9)
TR170
H2 IP20 1.5 (2) 1.5(2) – 100 (4)
H9 IP20 – – 1.5 (2) 100 (4)
Table 3.1 Clearance Required for Cooling
NOTICE
With IP21/NEMA Type1 option kit mounted, a distance of 50 mm (2 in) between the units is required.
Installation
6
08/2020 All rights reserved.
BAS-SVX58D-EN
3