RT-SVX34C-EN 111
Startup
Final Unit Checkout
After completing all of the checkout and startup procedures outlined in the previous sections (i.e.,
operating the unit in each of its modes through all available stages of cooling and heating), perform
these final checks before leaving the unit:
• Verify that the RTRM is in the normal operation mode. The LED located on the UCP module is
"on" and glowing continuously.
For Constant Volume Units;
• Verify that the "Mode" selection switch and the "Zone Temperature" setpoints are set and/or
programmed at the sensor modules.
For Variable Air Volume Units;
The RTAM has input setpoint potentiometers inside the control panel that are set at the factory
which will allow the unit to operate and maintain system control. For specific job specifications;
• Verify that the control input potentiometers are set according to the job specifications, i.e.;
– Outside air reset temperature - _______ Setpoint
– Reset amount °F. - _______ Setpoint
– Static pressure - _______ Setpoint
– Static pressure deadband - ________ Setpoint
– Discharge air temperature - _______Setpoint
– Morning warmup temperature - _______ Setpoint
– Exhaust Fan - _______ Setpoint
• Inspect the unit for misplaced tools, hardware and debris.
• Verify that all unit exterior panels—including the control panel doors—are secured in place.